Archive for November, 2016

Bathroom Renovation – Week 3

Thursday, November 24th, 2016

Screed. Bath tub installation. Framing the bath tub. Sheeting. Installing shower curtain track. Painting ceiling.

201a5148

201a5156

201a5157

 

201a5163

201a5173

Bathroom Renovation – Week 2

Wednesday, November 23rd, 2016

Cement rendering. Timber framing. Waterproofing. More plumber rough-in.

201a4949

201a4950

201a4953

201a4954

img_20161111_122613

Bathroom Renovation – Week 1

Tuesday, November 22nd, 2016

Demolition. Electrical and Plumbing Rough in. Paint stripping on the window.

201a4932

201a4937

201a4934

201a4947

201a4930 201a4931

Bathroom Renovation – Before Photos

Monday, November 21st, 2016

This is the main bathroom between the 2 bedrooms. Accessed from the Hallway.

201a4925

Those floor tiles have come back into fashion. The sticky tape on the floor was me laying everything out to see if there was any way to have a separate shower and bath. It was just too small.

201a4929

201a4927

201a4928

Those 4 different tiles there is when I went to grab some tp and most of the wall tiles came down. My husband used the ones that didn’t break and had to buy some new ones to put it back together.

Besides that, we haven’t touched this bathroom.